Design & Production Process
-
 

At we ensure that our Design & Production processes are well planned and implemented in order to secure the quality of products and minimize on resources wastage.

A standard Design & Production Process in will take the following stages;

 

Single Line Drawings
Engineers produce the Single Line Panel layouts of the product.

 
Design & Planning
Engineers design the layout of the product by utilizing 3D drawing softwares.
 

Machinery Facilities
The Production Team will shape and prepare the parts based on the design.

This particular stage consists of;
Shearing Metal Sheet
• CNC Turret Punching
• Welding

     

Copper Busbar Preparation
The Production Team will then prepares the copper busbar component.

This particular stage consists of;
Copper bar cutting to specific sizes.
• NC Turret Punching
• Busbar Digital Bending

     

Painting
The Production Team will then proceed with the painting stage.

This particular stage consists of;
Load to Conveyorized Oven.
• Degreasing
• Epoxy Spraying
• Curing

     

Assembly & Wiring
The Production Team will assemble the parts prepared and conduct wiring.

This particular stage consists of;
Frame assembly.
• Busbar installation.
• Backet & Channel installation.
• Wiring.
• Other components installation.

     

Testing & Measuring
All test instruments used are calibrated (except the indicator instruments) before the expiry of the calibration due date as specified on the instrument list and the Calibration Schedule. Calibrations are made against a certified standard or instrument of a higher accuracy and are traceable to the nationally or the internationally recognized standards.

Calibrated Instruments;

0 - 5k V AC High Voltage Test set.
0 - 500 V DC Insulation Resistance Tester
Digital Multimeter
   
Indicator Instruments;
0 - 1000A primary Current Injection Test Set
3 Phase Load Tester
0 - 300V Variable DC Source
Protection relay Tripping Time Counter
     
Packing & Delivery
Completed installed products will be tested before packing for shipping.
 
 
   
 